Post Installation Testing
Goals
- Reduce Risk, Growth
Background and strategic fit
After a node operator has installed the RChain Node software, the installation system will validate the installation. When the node boots up for the first time, it will validate that everything is functioning properly. These 'boot checks' should happen before a node chooses to join a namespace, set the mode in which the node will operate - Full validator or ?
Assumptions
Requirements
# | Title | User Story | Importance | Notes |
---|---|---|---|---|
1 | ||||
2 |
User interaction and design
Questions
Below is a list of questions to be addressed as a result of this requirements document:
Question | Outcome |
---|---|